BLINDING CONCRETE WORKS- CHECKLIST

Ensure the surface roughness of the concrete is satisfactory prior to proceeding with the blinding concrete placement.

Verify that the conduits and junction boxes are properly fixed and in position prior to the commencement of the blinding concrete.

Ensure that the movement joints are fixed with crack inducers prior to the commencement of blinding works.

Ensure that the approved concrete mix has arrived on site, and that the slump cone, thermometer, and cubes are arranged for testing fresh concrete.

Ensure that the levels are checked as required by the surveyor, and that the survey report has been completed.

Ensure that proper wooden tamping is done for consolidation.

Check that the top level of the blinding concrete is as per the approved drawing.

Check that the surface finish is acceptable as required.

Check that water curing is done for 7 days.

Ensure that the blinding concrete surface is covered for traffic until it attains sufficient strength.

Check and ensure there are no foreign materials or impermeable soil substances that could reduce the effectiveness of the anti-termite treatment in the areas to be treated.

Ensure the applicator has a valid license and is wearing the necessary PPE before application.

Ensure that no substandard materials or workmanship are permitted on site.

Check and record the moisture content of the soil before application.

Check and reapply the soil treatment solution to areas disturbed by subsequent excavation, grading, or other construction activities following the application.

Avoid disturbing treated soil after application.

Ensure warning signs are posted in areas before and after application.

 