Inspection
and Test Plan for ANTI-TERMITE WORKS
The purpose of this ITP is to guide the QC Inspector on the item the needs to be inspected and certify as approved by the Consultant prior to proceeding on the next activity.
Also the required testing and frequency are mentioned in this ITP. This will help the QAQC identifying all the required test in order to attain the required material quality.
Sl. no |
Description of Activity |
Control Procedure/ Spec. / codes/ standard |
Frequency |
Acceptance Criteria |
Responsible person |
|
|||
Contractor |
Consultant |
Third Party |
Attachments |
||||||
1.0 |
Approval of Documents |
|
|
|
|
|
|
|
|
1.1 |
Method Statement |
Section No. |
Once |
Consultant Approval |
Project Engineer / QAQC
Engineer |
R |
R |
- |
MST / ITP / Risk
Assessment / Checklist |
1.2 |
Anti-Termite Material
Approval |
Section No. |
Once |
Consultant Approval |
Project Engineer / QAQC
Engineer |
R |
R |
- |
Material Submittals |
2.0 |
Anti-Termite Works |
|
|
|
|
|
|
|
|
2.1 |
Protecting existing/
adjacent works |
Approved Method Statement |
Every application of
Anti-termite |
Consultant Approval |
Site Engineer / QAQC
Engineer |
S |
S |
- |
|
2.2 |
Surface preparation prior
to application of anti-termite |
Approved Method Statement |
Every application of
Anti-termite |
Consultant Approval |
Site Engineer / QAQC
Engineer |
H |
H |
- |
Inspection Request and Checklist |
2.3 |
Mixing of Agenda 25 EC |
Approved Method Statement |
Every application of
Anti-termite |
Consultant Approval |
Nasco / QAQC Engineer |
S |
S |
- |
|
2.4 |
Application of Agenda |
Approved Method Statement |
Every application of
Anti-termite |
Consultant Approval |
Site Engineer / Nasco |
S |
S |
- |
|
2.5 |
Provide polyethylene sheet
cover after application of Agenda |
Approved Method Statement |
Every application of
Anti-termite |
Consultant Approval |
Site Engineer |
S |
S |
- |
|
Prepared
by: ….……. Reviewed by : …………… Approved by: ………………
QAQC Engineer Site QAQC Manager Project Manager