Check that the safety engineer is aware of the erection
program.
Check the weather reports for the day.
Ensure that steel columns and cross members are installed as
per approved drawings.
Check steel columns and cross members for alignment,
plumbness, and level.
Check that the correct nuts, bolts, and washers are being
used.
Check that the correct torque wrench setting is being used.
Check that the field weld joint setting is acceptable.
Check the completed erection against the "Approved for
Construction" drawings before welding the field welds.