Ensure that the painting sample panel is approved by the
consultant prior to proceeding with the work on-site.
Ensure that the approved materials, as per the
specification, are used on-site and verified.
Check that the painting system is in accordance with the
specification.
Ensure that the materials and color chart for the different
areas/items are approved by the consultant/client.
Check that the surface is ready for painting, which includes
ensuring that all cement work in the area is completed, and that cracks and
other imperfections are rectified.
Check that the surface preparations are done in accordance
with the manufacturer’s instructions and specifications.
Verify that the rendered/plastered surface is completely dry
prior to the application of painting works.
Ensure that the surrounding area is protected from paint
spillage.
Ensure that items like switches, sockets, etc., are
protected to a satisfactory level.
Check the mixing of paint as per the manufacturer’s
instructions.
Ensure that the primer, stucco, and the number of coats of
paint applied are correct, with the specified interval of time between
applications.
Check that the wet film thickness is as specified.
Check that the method of application is correct as per the
specification.
Ensure that the painted area is cleaned.
Ensure that the finish of the paint is acceptable.
Ensure that the painted area is protected against damage.