Check and verify that the latest drawing is approved.
Ensure that the carpet/carpet tiles and adhesives are
approved, and that the same quality is used on-site.
Ensure that the floor area is moisture-free and dry to
receive the carpet.
Ensure that the floor is broom/vacuum cleaned before the
adhesive is applied.
Verify that the application of adhesive/subfloor primer is
done in accordance with the manufacturer’s instructions.
Check that the carpet/carpet tiles are installed as per the
drawing and the manufacturer’s instructions.
Ensure that the carpet/tile surfaces are cleaned of dust,
protruding yarns, and visible adhesives.
Ensure that the final inspection is completed and accepted.
No comments:
Post a Comment