Pages

Friday, June 25, 2021

DEMOLITION - QUALITY CONTROL CHECKLIST

Check that the Soft Stripping Quality Control Check Sheet is signed off and accepted.

Ensure that all regulatory requirements comply with the authorities.

Ensure that the method of demolition and the materials used do not void existing warranties.

Check that the repair materials are approved.

Ensure minimal interference with the surrounding access and other adjacent facilities in use.

Check that pollution control arrangements and temporary protection for personnel and materials are provided.

Ensure that dust-proof partitions and temporary enclosures are erected, if required.

Check that structural supports are provided for selective demolition and adjacent facilities to remain.

Ensure systematic demolition from higher to lower levels.

Ensure that the demolition is carried out only to the extent required by the new construction.

Ensure that structural framing members are removed using the proper method.

 


No comments:

Post a Comment

CHECKLIST FOR INSTALLATION OF GI CONDUITS AND ACCESSORIES

Check that the latest approved as-built / Shop Drawing is attached. Check that the material used in the installation is in accordance with...