FALSE CEILING - QUALITY CONTROL CHECKLIST

Verify that the reflected ceiling plan is approved prior to proceeding with the works.

Verify that all partition materials used on-site are approved, in good condition, properly stacked, and covered.

Check and verify that the setting and marking out of dimensions for the bulkheads, column cladding, and ceiling works are as per the drawing and reference points.

Ensure that all channels, studs, and bracing are secured tightly in accordance with the drawing.

Confirm that electrical fittings and other required installations are installed as per the specification and drawing before the boarding of the gypsum ceiling, installation of service tiles, and cladding works.

Verify that additional supports are provided for all light fixtures, etc.

Ensure that the cables and wires are properly clamped together.

Check that all the openings required for the installation of MEP penetrations are in the correct position, dimensioned correctly, and acceptable.

Ensure that the ductwork is completed, and that ducts and visible openings above the false ceiling are properly sealed using normal/fire sealant.

Check the smoothness and evenness of the gypsum/plasterboard joints, ensuring they are acceptable for applying finishing paint.

Check that MEP installations above the false ceiling have been tested and commissioned prior to the installation of the plain tiles.

Check that the work area is thoroughly cleared and all snags have been rectified (raise an inspection request).

Verify that the reflected ceiling plan is approved prior to proceeding with the works.

 


No comments:

Post a Comment

CHECKLIST FOR INSTALLATION OF GI CONDUITS AND ACCESSORIES

Check that the latest approved as-built / Shop Drawing is attached. Check that the material used in the installation is in accordance with...