Check that the surface of the retaining wall is ready for
the application of the approved primer.
Check that the primer is applied up to the required
elevation as per the approved drawing.
Ensure that the concrete chamfers are considered.
Check that the block-outs are terminated with waterproofing.
Ensure that the waterproofing membranes are installed as per
the drawing.
Ensure that the protection board, as per approved materials,
is applied.
Ensure that the welding connections and overlap of the
waterproofing membrane are as per the manufacturer's instructions.
Ensure that the concrete protection is acceptable before
backfilling.