1. Ensure the surface roughness of concrete satisfactory prior to proceed with screed placement.
2. Verify the conduits & junction boxes are fixed properly and in position prior to the commencement of screening.
3. Ensure the movement joint are fixed with crack inducer prior to the commencement of screed.
4. Ensure that the approved Screed mix is arrived to site
5. Ensure that the levels are checked as required.
6. Ensure that the proper wooden tamping is done for consolidation
7. Check the top level of screed is as per approved drawing.
8. Check that the surface finish is acceptable as required.
9. Check that the water curing is done for 7 days.
10. Ensure that the Screed surface is covered for traffic till it attains sufficient strength.